J-2 Contracting has constructed a number of parks and streetscapes along the Front Range of Colorado and in southern Wyoming.
We pride ourselves in the quality of workmanship and attention to detail that we have invested in the construction of these projects to make them cost-efficient for the project owner and enjoyable for those who use them. We have the project management skills to effectively manage multiple highly complex projects simultaneously while ensuring high quality.
Some of the features we have built within the parks we have constructed include structural concrete play areas, water features, sculpture settings, natural boulder placement, decorative concrete, interlocking pavers, irrigation, landscaping, custom-fabricated fencing and light poles, handrails, skate parks, bus/shade shelters, and restroom facilities.
We offer design-collaboration services for park construction to allow owners, engineers, and architects to leverage our experience in order to determine constructibility and optimize cost containment.
CLICK THE PROJECTS BELOW TO SEE OUR WORK:
Loveland Boyd Lake Roundabout
J-2 constructed Boyd Lave Ave. from HW34 to Mountain Lion Dr. This project required construction of a new roundabout, excavation, storm sewer, concrete curb and gutter, asphalt paving, striping, and landscaping. The completed project greatly improved traffic flow on Boyd Lake Ave. south of HW34.