Drainage System & Flood Control Improvement Projects

LPATH Berm & Erosion Control

Role: Prime Contractor
Owner: City of Fort Collins Engineering
Contract Amount: $1,004,845
Construction Dates: 11/06-3/07
Description: Construction of drainage basin/spillways using concrete wire walls and concrete revetment mats. Project required excavation and fills of approximately 20,000 cu. yds. of native materials. Extensive dewatering in multiple areas was also required during the project.

Stone Mountain Parking Lot

Role: Prime Contractor
Owner: City of Loveland Engineering
Contract Amount: $161,000
Construction Completion Date: 9/07
Description: Construction of a 7,000 SF pervious pavement parking lot in downtown Loveland, including 3’ over excavation, installation of drainage rock reservoir, curb gutter, sidewalk, and 6” thick pervious concrete pavement.