Horsetooth Reservoir South Bay Swim Beach Improvements

Role: Prime Contractor
Owner: Larimer County
Contract Amount: $568,891
Construction Dates: 4/10-11/10
Description: Construction of a park restroom and shade structure facility including CMU building with standing seam metal roof, prefabricated structural steel shelter, colored concrete plaza paving, boulder retaining wall, Stabilizer Solutions crushed-fine pathway, recycled asphalt parking lot.