LPATH Berm and Erosion Control

lpath-berm-erosion-controlRole: Prime Contractor
Owner: City of Fort Collins Engineering
Contract Amount: $1,004,845
Construction Dates: 11/06-3/07
Description: Construction of drainage basin/spillways using concrete wire walls and concrete revetment mats. Project required excavation and fills of approximately 20,000 cu. yds. of native materials. Extensive dewatering in multiple areas was also required during the project